![]() ![]() This section is intended to supplement the General and Special Conditions. See the General Contract Conditions for additional information pertaining to measurement and payment. Items may include work within a single section or in more than one section. ![]() The method of measurement and basis of payment described are for the work itemized in the Bid Form and in the sections of the specifications. Do not prepare pay estimates based on these descriptions.Īll measurements and payments will be based on work completed in strict accordance with the plans and specifications for the project. NOTE: The Pay Item descriptions listed herein are hypothetical and will vary with each project. PART 2 - PRODUCTS (Not applicable) PART 3 - EXECUTION (Not applicable) END OF SECTION 01010 The materials and installation methods specified herein are to be considered standard for all work ordered by and performed for the Department of Parks and Recreation in the construction of new facilities in the parks. The Contractor represents that he fully understands the nature and extent of the Work, all factors and conditions affecting or which may be affected by it and characteristics of its various parts and elements and their fitting together and functioning.ĭESCRIPTION OF WORK: The following work items are included in these specifications: earthwork storm drainage concrete walks and other flatwork asphalt pavements chain link fencing modular block walls irrigation topsoil and soil preparation seeding and sodding and protection and retention of existing trees, transplanting trees and planting new trees. Should a conflict occur in or between Drawings and Specifications, Contractor is deemed to have estimated on the more expensive way of doing work unless he shall have asked for and obtained written decision before submission of Bid as to which method or materials will be required. If these documents or job conditions make it impossible to produce first class work or to warranty the work or the Contractor's performance, or should discrepancies appear among the Contract Documents, the Contractor must immediately request interpretation, correction or clarification in accordance with General Condition 404. The Work to be done under this Contract is the construction of the Work as shown, documented, and set forth in the Contract Documents, in a workmanlike manner, to the satisfaction of the Project Manager. RELATED DOCUMENTS: The General Contract Conditions, Drawings and other Division-1 Specification sections apply to Work of this Section.ĭESCRIPTION: This section includes general description of the Work with limitations or coordination with other contracts, if any. 10ĭIVISION 3 - CONCRETE 03300 Cast-in-Place Concrete.11 2 Turfgrass Seeding.5 Native Seeding.9 Sodding. 2 Surfacing Materials.2 Tree Transplanting.3 Soil Preparation.5 4 Traffic Markings.2 Subdrainage Systems.2 Storm Sewerage.1 Irrigation System. 2 Asphalt Pavement.1 Concrete Walks, Curbs and Miscellaneous Flatwork. 8 02220 Excavating and Backfilling of Trenches.1Ġ2232 Aggregate Base Course. 2 02150 Tree Retention and Protection.10 02200 Earthwork. 4 Quality Control.6 Construction Facilities and Temporary Controls.3 Erosion and Sedimentation Control.6 Material and Equipment.4 Contract Closeout. 3 Construction Surveying.1 Administration, Procedures and Codes.2 Project Meetings.3 Submittals. Summary of Work.1 Measurement and Payment. Denver Parks and Recreation Standard Specifications
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |